Prototypin

Luen Tai Rubber technical team can help with prototyping and planning largest volume production runs finding the best customised solution in the most cost-effective manner.
Once that the design has been agreed and the rubber specified, our craftsmen in the tool department manufacture a steel prototype mould by computer numerical control machines (CNC) and by electrical discharge machines (EDM).

We can provide prototype samples with the same specifications of the production parts within 10 to 20 working days depending on the complexity of the rubber component.
Your design engineers can evaluate the products using production grade tooling and comparing various materials and hardness.

Prototypin